All Types pool
remodeling, or re-marciting, process is outlined below:
1. Drain
the pool 2. Grind around the pool fixtures & under the tile 3. Blast loose & flaking marcite with a 4000psi
pressure washer 4. Check the old pool finish for hollow spots 5. Roll on the substrate over the entire pool & let
it dry over night (Bond Kote) 6. Apply new marcite/exposed aggregate finish 7. Lightly acid wash the new finish 8. Start refilling the pool that same day
Most remodeling
jobs are finished within 2 to 3 days. Free estimates for each
remodel are quoted on a per project basis. Below is a list of
the products All Types can use for a re-marciting project. Click
on each product to see more detailed information about them.